A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
This report contains market size and forecasts of Data Center Construction in Global, including the following market information:
Global Data Center Construction Market Revenue, 2017-2022, 2023-2028, ($ millions)
Global top five companies in 2021 (%)
The global Data Center Construction market was valued at 27560 million in 2021 and is projected to reach US$ 54850 million by 2028, at a CAGR of 10.3% during the forecast period.
The U.S. Market is Estimated at $ Million in 2021, While China is Forecast to Reach $ Million by 2028.
Electrical Construction Segment to Reach $ Million by 2028, with a % CAGR in next six years.
The global key manufacturers of Data Center Construction include Whiting-Turner Contracting, Turner Construction, Holder Construction, DPR Construction, Fortis Construction, HITT Contracting, STO Building Group (formerly Structure Tone), JE Dunn Construction and Hensel Phelps, etc. In 2021, the global top five players have a share approximately % in terms of revenue.
MARKET MONITOR GLOBAL, INC (MMG) has surveyed the Data Center Construction companies, and industry experts on this industry, involving the revenue, demand, product type, recent developments and plans, industry trends, drivers, challenges, obstacles, and potential risks.
Total Market by Segment:
Global Data Center Construction Market, by Type, 2017-2022, 2023-2028 ($ millions)
Global Data Center Construction Market Segment Percentages, by Type, 2021 (%)
- Electrical Construction
- Mechanical Construction
- General Construction
Global Data Center Construction Market, by Application, 2017-2022, 2023-2028 ($ millions)
Global Data Center Construction Market Segment Percentages, by Application, 2021 (%)
- Finance
- Internet
- Telecommunications
- Government
- Others
Global Data Center Construction Market, By Region and Country, 2017-2022, 2023-2028 ($ Millions)
Global Data Center Construction Market Segment Percentages, By Region and Country, 2021 (%)
- North America
- - US
- - Canada
- - Mexico
- Europe
- - Germany
- - France
- - U.K.
- - Italy
- - Russia
- - Nordic Countries
- - Benelux
- - Rest of Europe
- Asia
- - China
- - Japan
- - South Korea
- - Southeast Asia
- - India
- - Rest of Asia
- South America
- - Brazil
- - Argentina
- - Rest of South America
- Middle East & Africa
- - Turkey
- - Israel
- - Saudi Arabia
- - UAE
- - Rest of Middle East & Africa
Competitor Analysis
The report also provides analysis of leading market participants including:
Key companies Data Center Construction revenues in global market, 2017-2022 (estimated), ($ millions)
Key companies Data Center Construction revenues share in global market, 2021 (%)
Further, the report presents profiles of competitors in the market, key players include:
- Whiting-Turner Contracting
- Turner Construction
- Holder Construction
- DPR Construction
- Fortis Construction
- HITT Contracting
- STO Building Group (formerly Structure Tone)
- JE Dunn Construction
- Hensel Phelps
- AECOM
- Rogers-O'Brien Construction
- Clune Construction
- Gilbane
- Balfour Beatty US
- Mortenson Construction
Data Center Construction Market - Global Outlook and Forecast 2022-2028
Table of Contents
1 Introduction to Research & Analysis Reports
1.1 Data Center Construction Market Definition
1.2 Market Segments
1.2.1 Market by Type
1.2.2 Market by Application
1.3 Global Data Center Construction Market Overview
1.4 Features & Benefits of This Report
1.5 Methodology & Sources of Information
1.5.1 Research Methodology
1.5.2 Research Process
1.5.3 Base Year
1.5.4 Report Assumptions & Caveats
2 Global Data Center Construction Overall Market Size
2.1 Global Data Center Construction Market Size: 2021 VS 2028
2.2 Global Data Center Construction Market Size, Prospects & Forecasts: 2017-2028
2.3 Key Market Trends, Opportunity, Drivers and Restraints
2.3.1 Market Opportunities & Trends
2.3.2 Market Drivers
2.3.3 Market Restraints
3 Company Landscape
3.1 Top Data Center Construction Players in Global Market
3.2 Top Global Data Center Construction Companies Ranked by Revenue
3.3 Global Data Center Construction Revenue by Companies
3.4 Top 3 and Top 5 Data Center Construction Companies in Global Market, by Revenue in 2021
3.5 Global Companies Data Center Construction Product Type
3.6 Tier 1, Tier 2 and Tier 3 Data Center Construction Players in Global Market
3.6.1 List of Global Tier 1 Data Center Construction Companies
3.6.2 List of Global Tier 2 and Tier 3 Data Center Construction Companies
4 Market Sights by Product
4.1 Overview
4.1.1 by Type - Global Data Center Construction Market Size Markets, 2021 & 2028
4.1.2 Electrical Construction
4.1.3 Mechanical Construction
4.1.4 General Construction
4.2 By Type - Global Data Center Construction Revenue & Forecasts
4.2.1 By Type - Global Data Center Construction Revenue, 2017-2022
4.2.2 By Type - Global Data Center Construction Revenue, 2023-2028
4.2.3 By Type - Global Data Center Construction Revenue Market Share, 2017-2028
5 Sights by Application
5.1 Overview
5.1.1 By Application - Global Data Center Construction Market Size, 2021 & 2028
5.1.2 Finance
5.1.3 Internet
5.1.4 Telecommunications
5.1.5 Government
5.1.6 Others
5.2 By Application - Global Data Center Construction Revenue & Forecasts
5.2.1 By Application - Global Data Center Construction Revenue, 2017-2022
5.2.2 By Application - Global Data Center Construction Revenue, 2023-2028
5.2.3 By Application - Global Data Center Construction Revenue Market Share, 2017-2028
6 Sights by Region
6.1 By Region - Global Data Center Construction Market Size, 2021 & 2028
6.2 By Region - Global Data Center Construction Revenue & Forecasts
6.2.1 By Region - Global Data Center Construction Revenue, 2017-2022
6.2.2 By Region - Global Data Center Construction Revenue, 2023-2028
6.2.3 By Region - Global Data Center Construction Revenue Market Share, 2017-2028
6.3 North America
6.3.1 By Country - North America Data Center Construction Revenue, 2017-2028
6.3.2 US Data Center Construction Market Size, 2017-2028
6.3.3 Canada Data Center Construction Market Size, 2017-2028
6.3.4 Mexico Data Center Construction Market Size, 2017-2028
6.4 Europe
6.4.1 By Country - Europe Data Center Construction Revenue, 2017-2028
6.4.2 Germany Data Center Construction Market Size, 2017-2028
6.4.3 France Data Center Construction Market Size, 2017-2028
6.4.4 U.K. Data Center Construction Market Size, 2017-2028
6.4.5 Italy Data Center Construction Market Size, 2017-2028
6.4.6 Russia Data Center Construction Market Size, 2017-2028
6.4.7 Nordic Countries Data Center Construction Market Size, 2017-2028
6.4.8 Benelux Data Center Construction Market Size, 2017-2028
6.5 Asia
6.5.1 By Region - Asia Data Center Construction Revenue, 2017-2028
6.5.2 China Data Center Construction Market Size, 2017-2028
6.5.3 Japan Data Center Construction Market Size, 2017-2028
6.5.4 South Korea Data Center Construction Market Size, 2017-2028
6.5.5 Southeast Asia Data Center Construction Market Size, 2017-2028
6.5.6 India Data Center Construction Market Size, 2017-2028
6.6 South America
6.6.1 By Country - South America Data Center Construction Revenue, 2017-2028
6.6.2 Brazil Data Center Construction Market Size, 2017-2028
6.6.3 Argentina Data Center Construction Market Size, 2017-2028
6.7 Middle East & Africa
6.7.1 By Country - Middle East & Africa Data Center Construction Revenue, 2017-2028
6.7.2 Turkey Data Center Construction Market Size, 2017-2028
6.7.3 Israel Data Center Construction Market Size, 2017-2028
6.7.4 Saudi Arabia Data Center Construction Market Size, 2017-2028
6.7.5 UAE Data Center Construction Market Size, 2017-2028
7 Players Profiles
7.1 Whiting-Turner Contracting
7.1.1 Whiting-Turner Contracting Corporate Summary
7.1.2 Whiting-Turner Contracting Business Overview
7.1.3 Whiting-Turner Contracting Data Center Construction Major Product Offerings
7.1.4 Whiting-Turner Contracting Data Center Construction Revenue in Global Market (2017-2022)
7.1.5 Whiting-Turner Contracting Key News
7.2 Turner Construction
7.2.1 Turner Construction Corporate Summary
7.2.2 Turner Construction Business Overview
7.2.3 Turner Construction Data Center Construction Major Product Offerings
7.2.4 Turner Construction Data Center Construction Revenue in Global Market (2017-2022)
7.2.5 Turner Construction Key News
7.3 Holder Construction
7.3.1 Holder Construction Corporate Summary
7.3.2 Holder Construction Business Overview
7.3.3 Holder Construction Data Center Construction Major Product Offerings
7.3.4 Holder Construction Data Center Construction Revenue in Global Market (2017-2022)
7.3.5 Holder Construction Key News
7.4 DPR Construction
7.4.1 DPR Construction Corporate Summary
7.4.2 DPR Construction Business Overview
7.4.3 DPR Construction Data Center Construction Major Product Offerings
7.4.4 DPR Construction Data Center Construction Revenue in Global Market (2017-2022)
7.4.5 DPR Construction Key News
7.5 Fortis Construction
7.5.1 Fortis Construction Corporate Summary
7.5.2 Fortis Construction Business Overview
7.5.3 Fortis Construction Data Center Construction Major Product Offerings
7.5.4 Fortis Construction Data Center Construction Revenue in Global Market (2017-2022)
7.5.5 Fortis Construction Key News
7.6 HITT Contracting
7.6.1 HITT Contracting Corporate Summary
7.6.2 HITT Contracting Business Overview
7.6.3 HITT Contracting Data Center Construction Major Product Offerings
7.6.4 HITT Contracting Data Center Construction Revenue in Global Market (2017-2022)
7.6.5 HITT Contracting Key News
7.7 STO Building Group (formerly Structure Tone)
7.7.1 STO Building Group (formerly Structure Tone) Corporate Summary
7.7.2 STO Building Group (formerly Structure Tone) Business Overview
7.7.3 STO Building Group (formerly Structure Tone) Data Center Construction Major Product Offerings
7.7.4 STO Building Group (formerly Structure Tone) Data Center Construction Revenue in Global Market (2017-2022)
7.7.5 STO Building Group (formerly Structure Tone) Key News
7.8 JE Dunn Construction
7.8.1 JE Dunn Construction Corporate Summary
7.8.2 JE Dunn Construction Business Overview
7.8.3 JE Dunn Construction Data Center Construction Major Product Offerings
7.8.4 JE Dunn Construction Data Center Construction Revenue in Global Market (2017-2022)
7.8.5 JE Dunn Construction Key News
7.9 Hensel Phelps
7.9.1 Hensel Phelps Corporate Summary
7.9.2 Hensel Phelps Business Overview
7.9.3 Hensel Phelps Data Center Construction Major Product Offerings
7.9.4 Hensel Phelps Data Center Construction Revenue in Global Market (2017-2022)
7.9.5 Hensel Phelps Key News
7.10 AECOM
7.10.1 AECOM Corporate Summary
7.10.2 AECOM Business Overview
7.10.3 AECOM Data Center Construction Major Product Offerings
7.10.4 AECOM Data Center Construction Revenue in Global Market (2017-2022)
7.10.5 AECOM Key News
7.11 Rogers-O'Brien Construction
7.11.1 Rogers-O'Brien Construction Corporate Summary
7.11.2 Rogers-O'Brien Construction Business Overview
7.11.3 Rogers-O'Brien Construction Data Center Construction Major Product Offerings
7.11.4 Rogers-O'Brien Construction Data Center Construction Revenue in Global Market (2017-2022)
7.11.5 Rogers-O'Brien Construction Key News
7.12 Clune Construction
7.12.1 Clune Construction Corporate Summary
7.12.2 Clune Construction Business Overview
7.12.3 Clune Construction Data Center Construction Major Product Offerings
7.12.4 Clune Construction Data Center Construction Revenue in Global Market (2017-2022)
7.12.5 Clune Construction Key News
7.13 Gilbane
7.13.1 Gilbane Corporate Summary
7.13.2 Gilbane Business Overview
7.13.3 Gilbane Data Center Construction Major Product Offerings
7.13.4 Gilbane Data Center Construction Revenue in Global Market (2017-2022)
7.13.5 Gilbane Key News
7.14 Balfour Beatty US
7.14.1 Balfour Beatty US Corporate Summary
7.14.2 Balfour Beatty US Business Overview
7.14.3 Balfour Beatty US Data Center Construction Major Product Offerings
7.14.4 Balfour Beatty US Data Center Construction Revenue in Global Market (2017-2022)
7.14.5 Balfour Beatty US Key News
7.15 Mortenson Construction
7.15.1 Mortenson Construction Corporate Summary
7.15.2 Mortenson Construction Business Overview
7.15.3 Mortenson Construction Data Center Construction Major Product Offerings
7.15.4 Mortenson Construction Data Center Construction Revenue in Global Market (2017-2022)
7.15.5 Mortenson Construction Key News
8 Conclusion
9 Appendix
9.1 Note
9.2 Examples of Clients
9.3 Disclaimer
List of Tables
Table 1. Data Center Construction Market Opportunities & Trends in Global Market
Table 2. Data Center Construction Market Drivers in Global Market
Table 3. Data Center Construction Market Restraints in Global Market
Table 4. Key Players of Data Center Construction in Global Market
Table 5. Top Data Center Construction Players in Global Market, Ranking by Revenue (2021)
Table 6. Global Data Center Construction Revenue by Companies, (US$, Mn), 2017-2022
Table 7. Global Data Center Construction Revenue Share by Companies, 2017-2022
Table 8. Global Companies Data Center Construction Product Type
Table 9. List of Global Tier 1 Data Center Construction Companies, Revenue (US$, Mn) in 2021 and Market Share
Table 10. List of Global Tier 2 and Tier 3 Data Center Construction Companies, Revenue (US$, Mn) in 2021 and Market Share
Table 11. By Type - Global Data Center Construction Revenue, (US$, Mn), 2021 & 2028
Table 12. By Type - Data Center Construction Revenue in Global (US$, Mn), 2017-2022
Table 13. By Type - Data Center Construction Revenue in Global (US$, Mn), 2023-2028
Table 14. By Application - Global Data Center Construction Revenue, (US$, Mn), 2021 & 2028
Table 15. By Application - Data Center Construction Revenue in Global (US$, Mn), 2017-2022
Table 16. By Application - Data Center Construction Revenue in Global (US$, Mn), 2023-2028
Table 17. By Region - Global Data Center Construction Revenue, (US$, Mn), 2021 & 2028
Table 18. By Region - Global Data Center Construction Revenue (US$, Mn), 2017-2022
Table 19. By Region - Global Data Center Construction Revenue (US$, Mn), 2023-2028
Table 20. By Country - North America Data Center Construction Revenue, (US$, Mn), 2017-2022
Table 21. By Country - North America Data Center Construction Revenue, (US$, Mn), 2023-2028
Table 22. By Country - Europe Data Center Construction Revenue, (US$, Mn), 2017-2022
Table 23. By Country - Europe Data Center Construction Revenue, (US$, Mn), 2023-2028
Table 24. By Region - Asia Data Center Construction Revenue, (US$, Mn), 2017-2022
Table 25. By Region - Asia Data Center Construction Revenue, (US$, Mn), 2023-2028
Table 26. By Country - South America Data Center Construction Revenue, (US$, Mn), 2017-2022
Table 27. By Country - South America Data Center Construction Revenue, (US$, Mn), 2023-2028
Table 28. By Country - Middle East & Africa Data Center Construction Revenue, (US$, Mn), 2017-2022
Table 29. By Country - Middle East & Africa Data Center Construction Revenue, (US$, Mn), 2023-2028
Table 30. Whiting-Turner Contracting Corporate Summary
Table 31. Whiting-Turner Contracting Data Center Construction Product Offerings
Table 32. Whiting-Turner Contracting Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 33. Turner Construction Corporate Summary
Table 34. Turner Construction Data Center Construction Product Offerings
Table 35. Turner Construction Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 36. Holder Construction Corporate Summary
Table 37. Holder Construction Data Center Construction Product Offerings
Table 38. Holder Construction Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 39. DPR Construction Corporate Summary
Table 40. DPR Construction Data Center Construction Product Offerings
Table 41. DPR Construction Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 42. Fortis Construction Corporate Summary
Table 43. Fortis Construction Data Center Construction Product Offerings
Table 44. Fortis Construction Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 45. HITT Contracting Corporate Summary
Table 46. HITT Contracting Data Center Construction Product Offerings
Table 47. HITT Contracting Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 48. STO Building Group (formerly Structure Tone) Corporate Summary
Table 49. STO Building Group (formerly Structure Tone) Data Center Construction Product Offerings
Table 50. STO Building Group (formerly Structure Tone) Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 51. JE Dunn Construction Corporate Summary
Table 52. JE Dunn Construction Data Center Construction Product Offerings
Table 53. JE Dunn Construction Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 54. Hensel Phelps Corporate Summary
Table 55. Hensel Phelps Data Center Construction Product Offerings
Table 56. Hensel Phelps Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 57. AECOM Corporate Summary
Table 58. AECOM Data Center Construction Product Offerings
Table 59. AECOM Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 60. Rogers-O'Brien Construction Corporate Summary
Table 61. Rogers-O'Brien Construction Data Center Construction Product Offerings
Table 62. Rogers-O'Brien Construction Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 63. Clune Construction Corporate Summary
Table 64. Clune Construction Data Center Construction Product Offerings
Table 65. Clune Construction Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 66. Gilbane Corporate Summary
Table 67. Gilbane Data Center Construction Product Offerings
Table 68. Gilbane Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 69. Balfour Beatty US Corporate Summary
Table 70. Balfour Beatty US Data Center Construction Product Offerings
Table 71. Balfour Beatty US Data Center Construction Revenue (US$, Mn), (2017-2022)
Table 72. Mortenson Construction Corporate Summary
Table 73. Mortenson Construction Data Center Construction Product Offerings
Table 74. Mortenson Construction Data Center Construction Revenue (US$, Mn), (2017-2022)
List of Figures
Figure 1. Data Center Construction Segment by Type in 2021
Figure 2. Data Center Construction Segment by Application in 2021
Figure 3. Global Data Center Construction Market Overview: 2020
Figure 4. Key Caveats
Figure 5. Global Data Center Construction Market Size: 2021 VS 2028 (US$, Mn)
Figure 6. Global Data Center Construction Revenue, 2017-2028 (US$, Mn)
Figure 7. The Top 3 and 5 Players Market Share by Data Center Construction Revenue in 2021
Figure 8. By Type - Global Data Center Construction Revenue Market Share, 2017-2028
Figure 9. By Application - Global Data Center Construction Revenue Market Share, 2017-2028
Figure 10. By Region - Global Data Center Construction Revenue Market Share, 2017-2028
Figure 11. By Country - North America Data Center Construction Revenue Market Share, 2017-2028
Figure 12. US Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 13. Canada Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 14. Mexico Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 15. By Country - Europe Data Center Construction Revenue Market Share, 2017-2028
Figure 16. Germany Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 17. France Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 18. U.K. Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 19. Italy Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 20. Russia Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 21. Nordic Countries Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 22. Benelux Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 23. By Region - Asia Data Center Construction Revenue Market Share, 2017-2028
Figure 24. China Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 25. Japan Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 26. South Korea Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 27. Southeast Asia Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 28. India Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 29. By Country - South America Data Center Construction Revenue Market Share, 2017-2028
Figure 30. Brazil Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 31. Argentina Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 32. By Country - Middle East & Africa Data Center Construction Revenue Market Share, 2017-2028
Figure 33. Turkey Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 34. Israel Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 35. Saudi Arabia Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 36. UAE Data Center Construction Revenue, (US$, Mn), 2017-2028
Figure 37. Whiting-Turner Contracting Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 38. Turner Construction Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 39. Holder Construction Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 40. DPR Construction Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 41. Fortis Construction Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 42. HITT Contracting Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 43. STO Building Group (formerly Structure Tone) Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 44. JE Dunn Construction Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 45. Hensel Phelps Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 46. AECOM Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 47. Rogers-O'Brien Construction Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 48. Clune Construction Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 49. Gilbane Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 50. Balfour Beatty US Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Figure 51. Mortenson Construction Data Center Construction Revenue Year Over Year Growth (US$, Mn) & (2017-2022)
Global Smart Irrigation Controllers Market Research Report 2024
Published: 08-Jan-2024 Price: US 2900 Onwards Pages: 97
There are different types of Smart Irrigation Controller, which take The guesswork out of scheduling irrigation system. These controllers use weather data and sensors to automatically adjust irrigation schedule to environmental changes. Smart Irrigation Controller includes Weather-based Controllers and Sensor-based Controllers in this report.
The global Smart Irrigation Controllers market was valued at US$ 443.3 million in 2023 and is anticipated to reach US$ 1086.5 million by 2030,......
Global Digital Scent Technology Market Research Report 2024
Published: 08-Jan-2024 Price: US 2900 Onwards Pages: 93
Digital scent technology is The engineering discipline dealing with olfactory representation. It is a technology to sense, transmit and receive scent-enabled digital media. For example, The addition of such equipment in The cinema for example, The device lets viewers watch a movie and feel The "flavor", brings a richer viewing experience.
Research and development has been given over The past decades, and The work principle and application means of digital scent technology have been develop......
Global Food Traceability Market Growth 2024-2030
Published: 04-Jan-2024 Price: US 3660 Onwards Pages: 115
According to our LPI (LP Information) latest study, the global Food Traceability market size was valued at US$ 15830 million in 2023. With growing demand in downstream market, the Food Traceability is forecast to a readjusted size of US$ 33500 million by 2030 with a CAGR of 11.3% during review period.
The research report highlights the growth potential of the global Food Traceability market. Food Traceability are expected to show stable growth in the future market. However, product diffe......
Global EAS Systems Market Growth 2024-2030
Published: 04-Jan-2024 Price: US 3660 Onwards Pages: 121
According to our LPI (LP Information) latest study, the global EAS Systems market size was valued at US$ million in 2023. With growing demand in downstream market, the EAS Systems is forecast to a readjusted size of US$ million by 2030 with a CAGR of % during review period.
The research report highlights the growth potential of the global EAS Systems market. EAS Systems are expected to show stable growth in the future market. However, product differentiation, reducing costs, and supply ch......
Global Containerized Data Center Market Growth (Status and Outlook) 2024-2030
Published: 04-Jan-2024 Price: US 3660 Onwards Pages: 112
According to our LPI (LP Information) latest study, the global Containerized Data Center market size was valued at US$ 8764.8 million in 2023. With growing demand in downstream market, the Containerized Data Center is forecast to a readjusted size of US$ 22430 million by 2030 with a CAGR of 14.4% during review period.
The research report highlights the growth potential of the global Containerized Data Center market. Containerized Data Center are expected to show stable growth in the futu......
Global Dispatch Consoles Market Growth (Status and Outlook) 2024-2030
Published: 04-Jan-2024 Price: US 3660 Onwards Pages: 112
According to our LPI (LP Information) latest study, the global Dispatch Consoles market size was valued at US$ 2452.7 million in 2023. With growing demand in downstream market, the Dispatch Consoles is forecast to a readjusted size of US$ 3237.5 million by 2030 with a CAGR of 4.0% during review period.
The research report highlights the growth potential of the global Dispatch Consoles market. Dispatch Consoles are expected to show stable growth in the future market. However, product diff......
Global Smart Irrigation Controllers Market Growth 2024-2030
Published: 04-Jan-2024 Price: US 3660 Onwards Pages: 107
According to our LPI (LP Information) latest study, the global Smart Irrigation Controllers market size was valued at US$ 433.7 million in 2023. With growing demand in downstream market, the Smart Irrigation Controllers is forecast to a readjusted size of US$ 1085.4 million by 2030 with a CAGR of 14.0% during review period.
The research report highlights the growth potential of the global Smart Irrigation Controllers market. Smart Irrigation Controllers are expected to show stable growth......
Global Smart Greenhouse Market Growth 2024-2030
Published: 04-Jan-2024 Price: US 3660 Onwards Pages: 153
According to our LPI (LP Information) latest study, the global Smart Greenhouse market size was valued at US$ 941 million in 2023. With growing demand in downstream market, the Smart Greenhouse is forecast to a readjusted size of US$ 1149.8 million by 2030 with a CAGR of 2.9% during review period.
The research report highlights the growth potential of the global Smart Greenhouse market. Smart Greenhouse are expected to show stable growth in the future market. However, product differentia......
Global Industrial Security Systems Market Research Report 2024
Published: 04-Jan-2024 Price: US 2900 Onwards Pages: 72
The Industrial Security Systems market size, estimations, and forecasts are provided in terms of revenue ($ millions), considering 2023 as the base year, with history and forecast data for the period from 2019 to 2030. This report segments the global Industrial Security Systems market comprehensively. Regional market sizes, concerning products by Type, by Application, and by players, are also provided.
For a more in-depth understanding of the market, the report provides profiles of the c......
SERVICES
Value for Money
We believe in "optimum utilization of available budget and resources". While servicing our clients' (your) market research requirements, we keep the same approach in focus to help you get the best value for your $$s.
Ever Growing Inventory
Ranging from the smallest feasible / required data (datasheets, data facts, SWOT analysis, company profiles, etc) to full research reports that help you make decisions, our inventory is updated almost on a daily basis with the latest industry reports from domain experts that track more than 5000 niche sectors.
One Stop Solution
Need a custom research report on medical devices market? Require all available business intelligence on 3D printing industry? Exploring F&B sector of a particular country/region? RnRMarketResearch.com is your one-stop-solution to all market intelligence needs. We not only offer custom research and consulting services, we also "bundle" reports to meet your needs and help you fetch the data analysis you require for your business.
Dedicated Client Engagement
Not limited to only "finding" relevant reports for you, our client engagement team dedicates its efforts to understand your "business need" and accordingly maps available research data to help you move forward. Call "your" client engagement executive any time of your day and get your questions answered in order to make the correct business decision.
Saving Time and Efforts
Simply share your research requirement details with us and let us do all the hard work to find required intelligence for you. When you add up our "one stop solution" and "dedicated client engagement" services mentioned above, you obviously know the time and effort saving you do by working with us.
Payment Flexibility
Working with Fortune 500 organizations, we understand the importance of being flexible for payments. Share your payment terms with us and we will surely match up to them to ensure you get access to required business intelligence data without having to wait for the payment to be done.
Post-Purchase Research Support
Have questions after reading a report / datasheet bought through us? Not sure about the methodology used for data available in the research? Talk to us / Share your questions with us and if required, we will connect you with the analyst(s)/author(s) of the report(s) and ensure you get satisfactory answers for the same. Need more data / analysis / report(s) on the topic of your research/project? The RnRMarketResearch.com team is here for you 24X7 to support you with your post-purchase requirements.
Subscription Offers & Packages (Get in touch with us for more details -
[email protected] / +1 888 391 5441 )
- Ad Hoc
-
- Pay - as - you - go / Bucket Subscriptions
- Fixed Cost for #of reports
- Customize / Personalize as per your needs