For a long time, the cure for diabetes type 1 and type 2 has relied on agonizing insulin shots for patients or insulin infusion via mechanical pumps. Regarding this, experts have been creating artificial pancreatic beta cells with the he…
The design life of the general offshore platform is about 20 years. According to the relevant regulations, if there is no other purpose, the service life must be dismantled after it expires. This is of great significance to ensuring the marine environment, navigation, and fishery production in the work area. The dismantled platforms are often old platforms that have been in operation for many years. The safety of the structures is low, and there is a large risk of lifting in parts with severe structural corrosion. Wellhead platform pipelines are dense, and it must be ensured that the residual oil and gas in the pipeline is thoroughly cleaned before dismantling. In addition, the underwater sludge cutting of the jacket is also a big problem in the demolition work.
This report elaborates the market size, market characteristics, and market growth of the Offshore Wellhead Platform Decommissioning industry, and breaks down according to the type, application, and consumption area of Offshore Wellhead Platform Decommissioning. The report also conducted a PESTEL analysis of the industry to study the main influencing factors and entry barriers of the industry.
In Chapter 3.4 of the report, the impact of the COVID-19 outbreak on the industry was fully assessed. Fully risk assessment and industry recommendations were made for Offshore Wellhead Platform Decommissioning in a special period. This chapter also compares the markets of Pre COVID-19 and Post COVID-19.
In addition, chapters 8-12 consider the impact of COVID-19 on the regional economy.
Key players in the global Offshore Wellhead Platform Decommissioning market covered in Chapter 13:
Aker Solutions
Ramboll Group
John Wood Group
Heerema Marine Contractors
Oceaneering International
AF Gruppen
In Chapter 6, on the basis of types, the Offshore Wellhead Platform Decommissioning market from 2015 to 2025 is primarily split into:
Floating Drilling Platform
Jack-up Drilling Platform
In Chapter 7, on the basis of applications, the Offshore Wellhead Platform Decommissioning market from 2015 to 2025 covers:
Surface Equipment Dismantling
Underwater Equipment Dismantling
Geographically, the detailed analysis of production, trade of the following countries is covered in Chapter 4.2, 5:
United States
Europe
China
Japan
India
Geographically, the detailed analysis of consumption, revenue, market share and growth rate of the following regions are covered in Chapter 8, 9, 10, 11, 12:
North America (Covered in Chapter 8)
United States
Canada
Mexico
Europe (Covered in Chapter 9)
Germany
UK
France
Italy
Spain
Others
Asia-Pacific (Covered in Chapter 10)
China
Japan
India
South Korea
Southeast Asia
Others
Middle East and Africa (Covered in Chapter 11)
Saudi Arabia
UAE
South Africa
Others
South America (Covered in Chapter 12)
Brazil
Others
Years considered for this report:
Historical Years: 2015-2019
Base Year: 2019
Estimated Year: 2020
Forecast Period: 2020-2025